4 Link suspension brackets.
Cutting the arch with a jigsaw.
Marking the other part of the "brdige"
Setting the "bridge" parallel with the axle for some tagwelds.
M16 Nut in the center of the axle for limit strap or suck down winch.
Time for welding, It's going to be easy with this thight fit.
The links.
Cutting the link tube. Seamless tube 46mm outer diameter. wall thickness 4mm.
Threaded bungs by "Trail Gear"
Threaded bung in link tube.
4 Link tubes with Threaded bungs tagwelded.
Creeperjoints by "Trail Gear" installed on the link tube.
Adjusting the length of the links.
View from the other side.